Projects

Nhon Trach 3, 4 Thermal Power Plant

Project information
General contractor/Investor Viet Nam Machinery Installation Corporation
Job
  • Package 1: Technical design, construction drawing design and soil improvement 
  • Package 2: Testing pile, supply and piling works
  • Package 3: Construction of Intake and Pumpit
Time 2022 - 2023
Address Dong Nai

Project category