Tra Vinh V1.3 Wind Power Plant (48MW)
Project information
General contractor/Investor | Vestas Wind Technology Vietnam LLC |
Job | - FECON undertakes Design and Build CBOP (Construction Surveying; design; test and PHC pile works; foundation wind turbine construction; link bridges; rest stop; mornitoring and O&M house)
- Total contract amount of 500 billion dong
|
Time | 8/2020 - 8/2021 |
Address | Tra Vinh |