Projects

Ha Khanh Urban Area (Phase 1)

Project information
General contractor/Investor Phu Xuan Construction & Engineering Co., Ltd.
Job

Construction of ground leveling, traffic roads (up to the end of C19 concrete layer), rainwater drainage system, wastewater drainage system, lighting pole foundations, cable conduits across traffic routes (except D19 and N17)

Time ~ 6 months
Address Ha Long, Quang Ninh

Project category